① PLC programming
Centered on S7-1200/1500, covering servo and motion control, PROFINET/Modbus communication, and all logic outside the safety circuits. |2 weeks–3 months · ¥18,000–128,000 / project · 1–2 commissioning visits
We undertake PLC programming, HMI configuration, host software development, program standardization, and multilingual engineering; we work off-site or remotely, deliver per project, and hand over source code and documentation. Before work begins we set a delivery checklist, quote the whole project at one fixed price, and verify it item by item at acceptance; intellectual property belongs to the customer.
If equipment breaks down and someone needs to be on site, go through On-Site Service, billed per visit or per day; it's normal for the same customer to need both — just quote them separately.
Five categories — you can commission just one, or the whole software suite together. Each category lists a rough timeline and price range; how many on-site visits and how travel is billed are itemized separately in the quote.
Centered on S7-1200/1500, covering servo and motion control, PROFINET/Modbus communication, and all logic outside the safety circuits. |2 weeks–3 months · ¥18,000–128,000 / project · 1–2 commissioning visits
TIA Portal WinCC, touch-panel screens, alarms and recipes, permission levels, multilingual screens. |1–2 weeks · ¥8,000–30,000 / project
WPF/Qt host software, OPC UA/Modbus/S7 data acquisition, SCADA, reports and traceability, MES integration. |2 weeks–3 months · starts in the tens-of-thousands range, assessed per requirements
Unified naming, module decomposition, completed comments, centralized alarms, version control, standardized handover documentation. |1–4 weeks · from ¥28,000 (assessed by existing program size)
TIA project text export, translation, terminology base, UI adaptation, write-back and screen-by-screen verification. |1–3 weeks · ¥15,000–50,000 / project · usually no on-site visits at all
Turn multiple machines of the same architecture into a program template + parameter configuration: develop the first machine, then deliver the rest by configuration. |First machine from ¥20,000, each subsequent machine 20%–35% less · first-machine commissioning on site
Corresponds to the project development offerings on the homepage; the formal quote is the written quotation confirmed after the requirements list is finalized. On-site visits and travel are itemized separately.
| Service | Specification | Reference price / timeline |
|---|---|---|
| Basic PLC programming | Single station, S7-1200, <200 points, basic logic | ¥18,000–45,000 · 2–4 weeks |
| Mid-to-large PLC programming | Multi-axis servo, PROFINET, <500 points | ¥62,000–128,000 · 1–3 months |
| HMI screen configuration | Single panel, <20 screens, alarms/recipes/permissions | ¥8,000–30,000 · 1–2 weeks |
| Host software data acquisition | OPC UA integration, basic reports, visualization | from ¥10,000 · 2–6 weeks |
| Custom host software development | Medium complexity, API integration, permission system | Assessed per requirements |
| Program standardization & refactoring | Tidying, naming, commenting, version control of existing programs | from ¥28,000 · 1–4 weeks |
| Project text multilingual | TIA project text translation, adaptation, verification | ¥15,000–50,000 · 1–3 weeks |
| Batch equipment templating | Templated development of multiple machines sharing one architecture | First machine from ¥20,000, subsequent machines 20%–35% less |
Project development demand is most concentrated among equipment manufacturers and integrators — short-staffed in peak season, unable to justify headcount in the off-season, and the electrical engineers they hire leave after a couple of years taking the programs with them. That concentration is where the demand is, not a judgment criterion: a factory that needs a whole new program gets it handled as a project the same way.
Project-based billing: no payroll in the off-season, no staffing shortage in the busy season. The industry break-even is roughly 380 hours of annual demand — below that, keeping a full-time PLC engineer costs more than delivering the work as projects; above that, consider building your own team.
We use AI for comment completion, first-pass multilingual translation, and initial screening of program defects, then finalize everything by hand. Delivery cycles for comparable projects shrink by about 30% versus purely manual work — and the time saved goes back into your schedule.
Every project delivers complete source files, fully symbolized and fully commented, an I/O point list, documentation, and a version record. A new person can take over without reverse-engineering it all — and without having to come back to us.
The contract states it plainly: once payment is settled in full, all intellectual property in the deliverables belongs to the client. We leave no backdoors, no license bindings, and we won't use common modules to lock you in.
VPN / remote gateways / offline simulation (PLCSIM, TIA simulation, virtual commissioning) keep development and self-testing in Changsha. A project typically involves 1–2 on-site visits (first power-on, commissioning, acceptance), a few days each, with travel and labor itemized separately and never mixed into the software fee. How many visits is a scheduling matter — it doesn't change that this is project-based delivery.
This was a job for a filling-equipment manufacturer: four machines with the same architecture had to be delivered one after another, and the program couldn't be written from scratch for each:
This is the most concrete difference between the two tracks: the effort you put in the first time carries over to the second and third. On-site service can't do that — a steel mill might have a communication fault this time and a servo alarm next time, and each has to be investigated from scratch. So project development gets faster and cheaper the more you do, while on-site service only scales by making more trips.
Every step has a deliverable and a payment milestone. This is a separate track from the on-site service's nine-step process, but how many on-site visits and how many days each — that's spelled out at quoting time.
Client names are handled per confidentiality requirements; the numbers are actual project scales.
The machines were going for export, so the handover documents and program structure had to be reviewed first: the original program had no module divisions, variable names mixed pinyin with raw addresses, alarm text was only abbreviations, and the timing logic for scanning and powder spreading was scattered across multiple blocks. We mapped the structure and ran a standards review, re-divided modules by functional unit, filled in comments and a variable dictionary, rewrote the alarms into a three-part 'symptom / cause / resolution' format, and produced a bilingual (Chinese/English) program manual and maintenance manual. The client later used these documents directly as part of their export handover package.
All the logic was crammed into OB1 and three FCs, with variable names like M10.3 and DB2.DBD14 — raw addresses. After refactoring, it was split by equipment unit into 14 FBs, with unified naming and interfaces, alarms centralized into one alarm table, process parameters moved into recipe DBs, and Git wired up for version control. Scan cycle time dropped from 11 ms to 7 ms.
The original project was Chinese-only, with alarm text mixing abbreviations and pinyin. We built a terminology base of 180 core terms, batch-exported, translated, and checked consistency, handled button overflow caused by long Russian words, and after writing back, verified screen by screen with screenshots.
Inspection data, parameters, operators, and machine status for every part had to be queryable, exportable, and traceable to the batch. We built a dual-protocol acquisition layer, parameter download with read-back verification, shift and yield reports, and automatic screenshot archiving of anomalies.
Spelled out up front to save everyone time.
We don't provide services to bypass OEM license protection or crack encrypted programs. For protected program blocks, the equipment owner must provide valid authorization documents.
We don't do 1:1 copies of someone else's program, nor rebranding or relabeling. Functional requirements can be re-implemented from the process.
We can do it, but first we spend half a day writing the scope into a checklist — otherwise the timeline and price are guesses and it'll end in disputes.
Designing and verifying safety circuits requires appropriate qualifications and certification, and we don't cross that line. We can support a qualified safety system integrator on the non-safety parts.
Every project starts its schedule only after the 30% deposit is paid. This protects both sides.
Fill it in to generate a requirements summary, copy it to WeChat, or just call; a preliminary quote within 24 hours (48 hours for complex projects).
Your information is assembled only in your browser and never uploaded to a server. After copying, send it to WeChat 13369210212.